The racking design is strictly in accordance with the requirements of the bidding documents.
Racking design considers transshape caused by uneven weight distribution of the cargo.
Racking is not connected to the building.
Racking design considers the impact of punching on the strength of the column.
Under the premise of meeting user requirements, the best solution is adopted.
We put reliability and safety first in the design of the plan, and fully consider the strength, rigidity and stability of the equipment in material selection and design, and all meet the requirements of national safety regulations.
Our company's rack structure calculation adopts the world's advanced finite element analysis software and design method, referring to Chinese rack design code: Steel rack structure design code CECS23: 90, and Chinese seismic design standard: Building seismic design code GB50011-2010. The calculation of strength, stiffness and stability was carried out, and the safety under the action of earthquake was comprehensively evaluated.
1.Inspection basis: GB700-88 carbon structural steel, GB699-88 high-quality carbon structural steel, supplier's standard.
2.Inspection ratio: one sample per batch.
3.Inspection items:
A. Check the material specifications, brand, manufacturer, finished product , mill certificate, etc.
B. Appearance quality: no cracks, inclusions and other defects visible to the naked eye.
C. size and quality: according to the supplier's enterprise standards and relevant national standards.
D. When in doubt about the material, send it to the relevant department for chemical analysis.
1.Inspection basis: The external contract documents shall be in accordance with the acceptance standards stipulated in the contract. Fastening standard parts are in accordance with industry standards and enterprise standards.
2.Inspection proportion:
3.Inspection items:
A. Check the material specifications, brand, manufacturer, product wheat, warranty certificate, etc.
B. Appearance quality: no defects such as variegated spots and burrs visible to the naked eye.
C, size and quality: according to the supplier's enterprise standards and relevant national standards.
D. When in doubt about the material, send it to the relevant department for chemical analysis.
4.Quality judgment:
If the items in the B and C dimensions are unqualified, the inspection will be doubled. If the unqualified items are found, the whole batch will be disqualified.
The item D is unqualified or one unqualified is found in the random inspection. The batch of products shall be treated as unqualified.
1.Inspection standard: product sample drawings and technical requirements.
2.Test method:
3.Inspection items:
4.Quality record: If there is any non-conforming product in the inspection, the non-conforming product will be dealt with directly, and random inspection will be performed on the product of the shift, and the quality record and the product division of the shift will be made.
1.Welding oil, scale and other contaminants before welding.
2.Electric welding machine operation, welding assembly as close as possible to each other; usually the welding gap should be within 0.1~0.8 mm
3.For gas shielded welding operations, the gaps and grooves of the weldments shall comply with the provisions of GB985 and GB986, and the welding wire shall comply with the provisions of GB5117 and GB5118.
4.The operation of the electric welding machine should be adjusted according to the thickness of the weldment. According to the company's current product voltage is set to 3 levels. Before welding, a test piece should be made (the same thickness material can be used). The weldment is judged as pass if it does not fall off.
5.Gas shielded welding operation, welding voltage is controlled at 20~30V; welding current is controlled at 200~230A; gas flow rate is controlled at 1 ~20 1/min; wire feeding speed is 6~12m/min, upper and lower limits can be taken according to the thickness of the welding;
6.Welders must wear labor safety supplies when operating, and no flammable items should be placed on the welding site.
1.Pre-treatment process
2.The drying process
3.Dusting process
The time under normal temperature is implemented according to the actual situation of the workpiece.
4. Curing process
The packing process is worked by the operator. The quality inspector inspects and leaves the factory in accordance with the ISO9001: 2000 international quality system and strictly in accordance with international standards.
1. Package of goods: Packed separately with different parts.
2. Package size of each package: about 2000kg/package.
3. Transportation mode: Adopt highway car transportation mode.
4. Packing is simple, rainproof, sunproof and anti-collision.
5. If racking components are damaged during transportation, we are responsible for free replacement.